TEL:+86-0755 8279 8157 | admin@greenbar.com.cn

Quality Assurance

Quality control center


Discussion on the value of continuous quality improvement in quality control We set quality standards for all products and appoint external suppliers of product components that meet our quality standards. In order to ensure the quality and consistency of products All products and functions of SBASE are tested by QC center before production.

Supply chain management and control system

 Quality management policy

【1】Establish supplier selection and assessment criteria, in-depth understanding of cooperative enterprises, give play to advantages and avoid risks. Sign the quality assurance agreement to specify the yield standard of parts. If the parts fail to meet the standard, they can be rejected and the right to investigate can be initiated. Green bar attaches importance to and supports environmental protection by signing environmental protection agreement, and helps customers to meet the strict environmental protection laws and regulations in Europe and America. 

【2】It advocates long-term cooperation and win-win relationship, and the cooperation with some suppliers has been maintained from the initial stage of enterprise establishment to now.

Organizational structure of quality management

Establish a quality management organization with four representative organizations in the whole process:

【1】 Software and hardware quality acceptance control represented by testing 

【2】 The whole process product quality control planning represented by R & D Quality

 【3】 Delivery quality improvement represented by quality assurance department 

【4】 To improve the company’s system capability and customer satisfaction represented by the quality management department

Whole process quality assurance

Reliability laboratory

1. Environmental equipment (test standard)

  • UV aging: light 8 h, condensation 4 h, 6 cycles 72 h
  • Equilibrium temperature: t high temperature 70 & deg; low temperature – 30 & deg; RH 93%
  • Salt spray: 35 & deg; 5% salt solution for 48h
  • True water waterproof: 3M soaking
  • Free fall: 1.2m drop test

2. Mechanical equipment (test standard)

Power meter: ensure safe operation of power system Integrating sphere: testing luminous flux efficiency of lighting spectrum products Spectrophotometer: t (transmittance) = I / I0 a (absorbance) = – LGT or a = K & middot; C & middot; l (thickness of cuvette) Rain test box: test the waterproof performance of various products, and test the waterproof performance of IP65 Leakage current tester: measure the total current, resistive current and its harmonic, power frequency reference voltage and its harmonic

IT Error Prevention

Get a Quote ?